What are the prerequisites for generating a Prediction?
The prerequisites or requirements for generating a Prediction are:
- Minimum number of records - At least 50 historical records are required to make a prediction. Accuracy will be higher with more records.
- Actual values of predicted field in historical records - These historical records should have the actual values for the field to be predicted, either directly in a field or should be derivable from other fields.